Commercial Spent Nuclear Fuel: Observations on the Key Attributes and Challenges of Storage and Disposal Options

Commercial Spent Nuclear Fuel: Observations on the Key Attributes and Challenges of Storage and Disposal Options

Full Title: Commercial Spent Nuclear Fuel: Observations on the Key Attributes and Challenges of Storage and Disposal Options
Author(s): U.S. Government Accountability Office
Publisher(s): U.S. Government Accountability Office
Publication Date: April 1, 2013
Full Text: Download Resource
Description (excerpt):

In November 2009, GAO reported on the attributes and challenges of a Yucca Mountain repository. A key attribute identified was that the Department of Energy (DOE) had spent significant resources to carry out design, engineering, and testing activities on the Yucca Mountain site and had completed a license application and submitted it to the Nuclear Regulatory Commission, which has regulatory authority over the construction, operation, and closure of a repository. If the repository had been built as planned, GAO concluded that it would have provided a permanent solution for the nation’s commercial nuclear fuel and other nuclear waste and minimized the uncertainty of future waste safety. Constructing the repository also could have helped address issues including federal liabilities resulting from industry lawsuits against DOE related to continued storage of spent nuclear fuel at reactor sites. However, not having the support of the administration and the state of Nevada proved a key challenge. As GAO reported in April 2011, DOE officials did not cite technical or safety issues with the Yucca Mountain repository project when the project’s termination was announced but instead stated that other solutions could achieve broader support.

Temporarily storing spent fuel in a central location offers several positive attributes, as well as challenges, as GAO reported in November 2009 and August 2012. Positive attributes include allowing DOE to consolidate the nation’s nuclear waste after reactors are decommissioned. Consolidation would decrease the complexity of securing and overseeing the waste located at reactor sites around the nation and would allow DOE to begin to address the taxpayer financial liabilities stemming from industry lawsuits. Interim storage could also provide the nation with some flexibility to consider alternative policies or new technologies. However, interim storage faces several challenges. First, DOE’s statutory authority to develop interim storage is uncertain. Provisions in the Nuclear Waste Policy Act of 1982, as amended, that allow DOE to arrange for centralized interim storage have either expired or are unusable because they are tied to milestones in repository development that have not been met. Second, siting an interim storage facility could prove difficult. Even if a community might be willing to host a centralized interim storage facility, finding a state that would be willing to host such a facility could be challenging, particularly since some states have voiced concerns that an interim facility could become a de facto permanent disposal site. Third, interim storage may also present transportation challenges since it is likely that the spent fuel would have to be transported twice–once to the interim storage site and once to a permanent disposal site. Finally, developing centralized interim storage would not ultimately preclude the need for a permanent repository for spent nuclear fuel.

Siting, licensing, and developing a permanent repository at a location other than Yucca Mountain could provide the opportunity to find a location that might achieve broader acceptance, as GAO reported in November 2009 and August 2012, and could help avoid costly delays experienced by the Yucca Mountain repository program. However, developing an alternative repository would restart the likely costly and time-consuming process of developing a repository. It is also unclear whether the Nuclear Waste Fund–established under the Nuclear Waste Policy Act of 1982, as amended, to pay industry’s share of the cost for the Yucca Mountain repository–will be sufficient to fund a repository at another site.

All statements and/or propositions in discussion prompts are meant exclusively to stimulate discussion and do not represent the views of OurEnergyPolicy.org, its Partners, Topic Directors or Experts, nor of any individual or organization. Comments by and opinions of Expert participants are their own.

Sign up for our Press Release Distribution List

    Your Name (required)

    Your Email (required)

    Please sign me up to receive press releases from OurEnergyPolicy.org.