Full Title: Grid Connection Barriers to Renewable Energy Deployment in the United States
Author(s): Will Gorman, Julie Mulvaney Kemp, Joseph Rand, Joachim Seel, Ryan H Wiser, Nick Manderlink, Fredrich Kahrl, Kevin Porter, and Will Cotton
Publisher(s): Joule
Publication Date: December 15, 2024
Full Text: Download Resource
Description (excerpt):
Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. The authors create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.