Back to OurEnergyLibrary search




Modernizing Minnesota’s Grid with All-Electric Buildings

Modernizing Minnesota’s Grid with All-Electric Buildings

Full Title: Modernizing Minnesota’s Grid with All-Electric Buildings
Author(s): Rocky Mountain Institute
Publisher(s): Rocky Mountain Institute
Publication Date: June 7, 2023
Full Text: Download Resource
Description (excerpt):

“Modernizing the Grid with All-Electric Buildings” discusses the grid infrastructure impacts of building electrification and why existing constraints should not slow heat pump deployment.
Minnesota must modernize its electric grid to maintain reliable and affordable power. Efficient, all-electric buildings can be a valuable tool in optimizing this evolution. There’s no need to wait: today’s grid can already serve thousands of new electric systems as utilities continue long-term planning efforts.

All statements and/or propositions in discussion prompts are meant exclusively to stimulate discussion and do not represent the views of OurEnergyPolicy.org, its Partners, Topic Directors or Experts, nor of any individual or organization. Comments by and opinions of Expert participants are their own.

Sign up for our Press Release Distribution List

    Your Name (required)

    Your Email (required)

    Please sign me up to receive press releases from OurEnergyPolicy.org.